Exploration of opportunities to reduce lead times for engineered-to-order products
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
Exploration of opportunities to reduce lead times for engineered-to-order products
作者:
Elfving, Jan Alarik.
面頁冊數:
322 p.
附註:
Chair: Iris D. Tommelein.
附註:
Source: Dissertation Abstracts International, Volume: 65-02, Section: B, page: 0900.
Contained By:
Dissertation Abstracts International65-02B.
標題:
Engineering, Civil.
電子資源:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3121469
ISBN:
0496688200
Exploration of opportunities to reduce lead times for engineered-to-order products
Elfving, Jan Alarik.
Exploration of opportunities to reduce lead times for engineered-to-order products
[electronic resource] - 322 p.
Chair: Iris D. Tommelein.
Thesis (Ph.D.)--University of California, Berkeley, 2003.
Data were collected from supply chains of power distribution equipment (PDE). The supply chains were described with help of detailed process maps and performance measures. Simulation was applied to gain further understanding of supply chain behavior. The data demonstrated that current design and procurement practices have a major impact on the delivery lead time of PDE.
ISBN: 0496688200Subjects--Topical Terms:
212394
Engineering, Civil.
Exploration of opportunities to reduce lead times for engineered-to-order products
LDR
:03422nmm _2200325 _450
001
162406
005
20051017073443.5
008
230606s2003 eng d
020
$a
0496688200
035
$a
00148907
035
$a
162406
040
$a
UnM
$c
UnM
100
0
$a
Elfving, Jan Alarik.
$3
227542
245
1 0
$a
Exploration of opportunities to reduce lead times for engineered-to-order products
$h
[electronic resource]
300
$a
322 p.
500
$a
Chair: Iris D. Tommelein.
500
$a
Source: Dissertation Abstracts International, Volume: 65-02, Section: B, page: 0900.
502
$a
Thesis (Ph.D.)--University of California, Berkeley, 2003.
520
#
$a
Data were collected from supply chains of power distribution equipment (PDE). The supply chains were described with help of detailed process maps and performance measures. Simulation was applied to gain further understanding of supply chain behavior. The data demonstrated that current design and procurement practices have a major impact on the delivery lead time of PDE.
520
#
$a
Finally, this dissertation proposes alternative practices to improve the current process of ETO products that can lead to major improvements over the delivery process. These alternatives include involving downstream players early in the delivery process, reducing document batch sizes, making decisions at last responsible moment, changing procurement methods, and sharing configuration software. In cooperation with industry partners it was estimated that these changes could have reduced a 2.5 year lead time by nearly 1 year. This could have led to major cost savings, particularly with respect to saved labor hours. However, major process changes in the delivery of ETO products also require redefinition of organizational relations in the delivery process. These extend to requiring an industry-wide rethinking of roles and responsibilities, risks and rewards as well as, contractual structures used in the ETO delivery process.
520
#
$a
Scholars and practitioners have long advocated the benefits of reduced lead times. Moreover, most, if not all members of a supply chain would gain from reduced lead times. However, the construction industry has been slow to radically reduce lead times, particularly for Engineered-To-Order (ETO) products. This research applies Transformation-Flow-Value (TFV) theory and lean methods in order to answer the following research question: How can the performance of ETO supply chains be improved?
520
#
$a
This work discusses the role design batch sizes and standards may have on the delivery process. It argues that the disadvantages of competitive bidding are poorly understood from a supply chain perspective. Competitive bidding generates waste not only in the procurement phase but also in the design and manufacturing phases, e.g., by forcing people to use early commitment and large batch sizes, and by involving downstream players late in the process. As a result, the delivery process is long and changes are tedious to carry out.
590
$a
School code: 0028.
650
# 0
$a
Engineering, Civil.
$3
212394
650
# 0
$a
Engineering, Industrial.
$3
212495
650
# 0
$a
Operations Research.
$3
227148
690
$a
0543
690
$a
0546
690
$a
0796
710
0 #
$a
University of California, Berkeley.
$3
212474
773
0 #
$g
65-02B.
$t
Dissertation Abstracts International
790
$a
0028
790
1 0
$a
Tommelein, Iris D.,
$e
advisor
791
$a
Ph.D.
792
$a
2003
856
4 0
$u
http://libsw.nuk.edu.tw/login?url=http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3121469
$z
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3121469
筆 0 讀者評論
全部
電子館藏
館藏
1 筆 • 頁數 1 •
1
條碼號
館藏地
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
000000000899
電子館藏
1圖書
學位論文
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
多媒體檔案
http://libsw.nuk.edu.tw/login?url=http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3121469
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼
登入