語系:
繁體中文
English
說明(常見問題)
圖資館首頁
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
The transaction cost economics of hi...
~
University of California, Berkeley.
The transaction cost economics of highway project delivery: Design-build contracting in three states.
紀錄類型:
書目-語言資料,印刷品 : Monograph/item
正題名/作者:
The transaction cost economics of highway project delivery: Design-build contracting in three states.
作者:
Whittington, Janice Marie.
面頁冊數:
291 p.
附註:
Adviser: David E. Dowall.
附註:
Source: Dissertation Abstracts International, Volume: 69-09, Section: A, page: 3777.
Contained By:
Dissertation Abstracts International69-09A.
標題:
Economics, Theory.
電子資源:
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3331840
ISBN:
9780549835653
The transaction cost economics of highway project delivery: Design-build contracting in three states.
Whittington, Janice Marie.
The transaction cost economics of highway project delivery: Design-build contracting in three states.
- 291 p.
Adviser: David E. Dowall.
Thesis (Ph.D.)--University of California, Berkeley, 2008.
Analysis nested pairs of projects within case studies of three institutional environments for highway project delivery. To address the possibility that public contracting may not be subject to an economizing force, transaction cost assumptions are merged with the analytical frameworks of positive political theory and the economic theory of institutional change. Results interpret the effect of dynamic political action on contracting outcomes. Case details suggest intricate relationships between the state bureaus and the political setting in which they operate, with systemic implications for cost effectiveness.
ISBN: 9780549835653Subjects--Topical Terms:
212740
Economics, Theory.
The transaction cost economics of highway project delivery: Design-build contracting in three states.
LDR
:02938nam _2200301 _450
001
206934
005
20090413130210.5
008
090730s2008 ||||||||||||||||| ||eng d
020
$a
9780549835653
035
$a
00372146
040
$a
UMI
$c
UMI
100
$a
Whittington, Janice Marie.
$3
321871
245
1 4
$a
The transaction cost economics of highway project delivery: Design-build contracting in three states.
300
$a
291 p.
500
$a
Adviser: David E. Dowall.
500
$a
Source: Dissertation Abstracts International, Volume: 69-09, Section: A, page: 3777.
502
$a
Thesis (Ph.D.)--University of California, Berkeley, 2008.
520
$a
Analysis nested pairs of projects within case studies of three institutional environments for highway project delivery. To address the possibility that public contracting may not be subject to an economizing force, transaction cost assumptions are merged with the analytical frameworks of positive political theory and the economic theory of institutional change. Results interpret the effect of dynamic political action on contracting outcomes. Case details suggest intricate relationships between the state bureaus and the political setting in which they operate, with systemic implications for cost effectiveness.
520
$a
Design-build delivery combines the tasks of engineering and construction into one contract with a private entity. Literature promoting design-build emphasizes the savings to cost and time earned from value engineering and concurrent engineering. Though increasingly applied, design-build can be controversial, as it is associated with the privatization of public engineering services.
520
$3
5 million, and common to the DOT. Results suggest that the simplest of designs, low in risk, subject to minimal externality and competition on the basis of price will be most effective in a design-build mode of governance.
$a
This dissertation applies transaction cost economics in preliminary analysis of the cost consequences of design-build contracts. I analyze design-build in comparison to traditional transactions for surface transportation in general and with respect to six pairs of comparable, completed projects. Theoretically, alternative contracts are cost-effective in relation to several variables: design complexity, design risk, negative externality, speed of delivery, competitive pressure on price, familiarity of the DOT to the tasks at hand, the project scale, and the work load distribution of the DOT. Each of the projects was constructed at a total cost, recorded in DOT accounting systems, of less than
590
$a
School code: 0028.
650
$a
Economics, Theory.
$3
212740
650
$a
Transportation.
$3
201352
650
$a
Urban and Regional Planning.
$3
212416
690
$a
0511
690
$a
0709
690
$a
0999
710
$a
University of California, Berkeley.
$3
212474
773
0
$g
69-09A.
$t
Dissertation Abstracts International
790
$a
0028
790
1 0
$a
Dowall, David E.,
$e
advisor
791
$a
Ph.D.
792
$a
2008
856
4 0
$u
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3331840
$z
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3331840
筆 0 讀者評論
全部
電子館藏
館藏
1 筆 • 頁數 1 •
1
條碼號
館藏地
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
000000024365
電子館藏
1圖書
電子書
TH
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
多媒體檔案
http://pqdd.sinica.edu.tw/twdaoapp/servlet/advanced?query=3331840
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼
登入