工程契約之變更-兼論業主變更指示權 = Study on the Var...
國立高雄大學法律學系碩士班

 

  • 工程契約之變更-兼論業主變更指示權 = Study on the Variation of Construction Contract-Extension Studies on Change Order of Proprietor
  • 紀錄類型: 書目-語言資料,印刷品 : 單行本
    並列題名: Study on the Variation of Construction Contract-Extension Studies on Change Order of Proprietor
    作者: 詹秉達,
    其他團體作者: 國立高雄大學
    出版地: [高雄市]
    出版者: 撰者;
    出版年: 2014[民103]
    面頁冊數: 211面圖,表 : 30公分;
    標題: 業主變更指示權
    標題: General Scope of Work
    電子資源: http://handle.ncl.edu.tw/11296/ndltd/79507369702272510331
    附註: 參考書目:面199-203
    附註: 103年12月16日公開
    摘要註: 工程契約係屬繼續性契約,具有向後開展之性質。又工程施工時期通常為數不短,施工之過程若與當初訂立契約所預設之情狀或態樣不盡相同時,即有可能需要變動契約之內容。唯並非所有與契約預設內容不同之情事,皆屬工程契約之變更,如實際施工中所產生之數量差異及漏項,因工作內容並未發生變動,是否為工程契約變更之一種?又工程工法之變更,是否屬契約變更之種類,亦容有爭議。而在目前實務上,工程契約上多訂有業主變更指示權使業主能夠依照實際施工狀況作調整,唯此條款的訂定是否屬於定型化契約條款?是否容許業主在任何情況下皆得行使業主變更指示權,而無庸受到限制?在業主行使變更指示權後,工程契約是否仍維持同一性,如何判斷、又判斷基礎何在?而業主變更指示權條款的訂立,亦涉及契約擬制變更問題之探討。本文擬就前開問題,進行相關文獻的整理與分析,並以民法契約的角度,作更一步之釐清,希對實務就相關問題之處理上,能有所助益。 This thesis is divided into seven chapters and will be addressed to the following subjects in the sequences of: Characterization of Construction Contract;Variation of Construction Law;Variation by the Order of Employer;Constructive Contact;Change of Agreement and Circumstances Change.A construction contract is described as an inherent continuing contract. It is usually time-consuming for the completion of a work; There may be changes or differences to quality or quantities of any item of a work in the contract accordingly. However, such changes or differences do not necessarily constitute a “variation” depending on the explanation of the general scope of a work in the contract. In the light of the advance of construction technologies and methods of performance play an important role to construction engineering;When it happens to change in the methods of performance, whether it constitutes a variation or not becomes a critical issue in the construction contract.In practice, “Change Order” is important in the construction contract so that variation may be initiated by the engineer without the contractor’s consent. Therefore, how to characterize the “Change Order” clause plays a critical role in this thesis. Could it be classified as a standard form contract? Could it be initiated by the engineer at any time without any limitation? After “Change Order” is being initiated, what kinds of certiorari could be used to judge the changes and whether it is beyond the general scope of work or not ? “Change Order” is also related to the constructive contract. This thesis will try to analyze issues above based on legal precedents and the domestic civil law.
館藏
  • 2 筆 • 頁數 1 •
 
310002492604 博碩士論文區(二樓) 不外借資料 學位論文 TH 008M/0019 380101 2723 2014 一般使用(Normal) 在架 0
310002492612 博碩士論文區(二樓) 不外借資料 學位論文 TH 008M/0019 380101 2723 2014 c.2 一般使用(Normal) 在架 0
  • 2 筆 • 頁數 1 •
評論
Export
取書館別
 
 
變更密碼
登入