語系:
繁體中文
English
說明(常見問題)
圖資館首頁
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Project controlintegrating cost and ...
~
DelPico, Wayne J.
Project controlintegrating cost and schedule in construction /
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
Project controlWayne J. Del Pico.
其他題名:
integrating cost and schedule in construction /
作者:
DelPico, Wayne J.
出版者:
Hoboken, New Jersey :Wiley,2013.
面頁冊數:
1 online resource.
標題:
Construction projectsManagement.
電子資源:
http://onlinelibrary.wiley.com/book/10.1002/9781118802717
ISBN:
9781118419137 (electronic bk.)
Project controlintegrating cost and schedule in construction /
DelPico, Wayne J.
Project control
integrating cost and schedule in construction /[electronic resource] :Wayne J. Del Pico. - Hoboken, New Jersey :Wiley,2013. - 1 online resource.
Includes bibliographical references and index.
The Basics -- Introduction to Project Control -- Pre-Construction Planning -- The Schedule -- The Budget -- Integrating the Schedule and the Budget -- Calculating and Analyzing Progress -- Analyzing & Reporting Variances in Schedule and Cost -- Recognizing Trends and Forecasting Performance -- Productivity -- Acceleration and Schedule Compression -- Resource Management -- Risk Management -- Project Closeout.
4 The Schedule; Basic Scheduling Concepts; Types of Schedules; The Checklist; The Schedule Board; The Bar Chart; The Look Ahead; The Linear Schedule; Advanced Scheduling Methods; Program Evaluation and Review Technique; Critical Path Method (CPM); The CPM Schedule as a Management Tool; Tasks; The Work Breakdown Structure; Task Types; Task Descriptions; Task Durations; Interdependencies; Complex Relationships-Lags and Leads; Milestones and Constraints; Float; Updating the Schedule; Summary; 5 The Budget; Fundamentals of the Estimating Process; Types of Estimates
ISBN: 9781118419137 (electronic bk.)
LCCN: 2013015017Subjects--Topical Terms:
283307
Construction projects
--Management.
LC Class. No.: TH438 / .D448 2013
Dewey Class. No.: 624.068/4
Project controlintegrating cost and schedule in construction /
LDR
:02764cmm a2200337 i 4500
001
467025
003
OCoLC
006
m o d
007
cr |||||||||||
008
160107s2013 njua o 001 0 eng
010
$a
2013015017
020
$a
9781118419137 (electronic bk.)
020
$a
1118419138 (electronic bk.)
020
$a
9781118802717 (electronic bk.)
020
$a
1118802713 (electronic bk.)
020
$z
9781118421062
020
$z
111842106X
020
$z
9781118139233 (cloth : acid-free paper)
035
$a
(OCoLC)840934616
035
$a
ocn840934616
040
$a
DLC
$b
eng
$c
DLC
$d
YDX
$d
OCLCO
$d
EBLCP
$d
N
$d
IDEBK
$d
E7B
$d
MEAUC
$d
YDXCP
$d
TEFOD
$d
DG1
$d
CUS
050
1 4
$a
TH438
$b
.D448 2013
082
0 0
$a
624.068/4
$2
23
100
1
$a
DelPico, Wayne J.
$3
721546
245
1 0
$a
Project control
$h
[electronic resource] :
$b
integrating cost and schedule in construction /
$c
Wayne J. Del Pico.
260
$a
Hoboken, New Jersey :
$b
Wiley,
$c
2013.
300
$a
1 online resource.
504
$a
Includes bibliographical references and index.
505
0
$a
The Basics -- Introduction to Project Control -- Pre-Construction Planning -- The Schedule -- The Budget -- Integrating the Schedule and the Budget -- Calculating and Analyzing Progress -- Analyzing & Reporting Variances in Schedule and Cost -- Recognizing Trends and Forecasting Performance -- Productivity -- Acceleration and Schedule Compression -- Resource Management -- Risk Management -- Project Closeout.
520
$a
4 The Schedule; Basic Scheduling Concepts; Types of Schedules; The Checklist; The Schedule Board; The Bar Chart; The Look Ahead; The Linear Schedule; Advanced Scheduling Methods; Program Evaluation and Review Technique; Critical Path Method (CPM); The CPM Schedule as a Management Tool; Tasks; The Work Breakdown Structure; Task Types; Task Descriptions; Task Durations; Interdependencies; Complex Relationships-Lags and Leads; Milestones and Constraints; Float; Updating the Schedule; Summary; 5 The Budget; Fundamentals of the Estimating Process; Types of Estimates
520
$a
Reasons and methodologies for proper planning, monitoring, and controlling construction project costs and schedule The key to successful construction project control is the fusing of cost to schedule, enabling the management of one to help the management of the other. This requires that a task's cost and its duration have a direct relationship, not an arbitrary assignment by the scheduler. Ensuring that relationship is correct and setting the appropriate baseline for tracking is the domain of the project control analyst. Written by a seasoned professional in the field, Pro.
588
$a
Description based on online resource; title from digital title page (viewed on October 29, 2013).
650
0
$a
Construction projects
$x
Management.
$3
283307
650
0
$a
Building
$x
Estimates.
$3
174930
650
0
$a
Scheduling.
$3
224416
856
4 0
$u
http://onlinelibrary.wiley.com/book/10.1002/9781118802717
筆 0 讀者評論
全部
電子館藏
館藏
1 筆 • 頁數 1 •
1
條碼號
館藏地
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
000000114751
電子館藏
1圖書
電子書
EB TH438 D448 2013
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
多媒體檔案
http://onlinelibrary.wiley.com/book/10.1002/9781118802717
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼
登入