語系:
繁體中文
English
說明(常見問題)
圖資館首頁
登入
回首頁
切換:
標籤
|
MARC模式
|
ISBD
Production planning with capacitated...
~
Missbauer, Hubert.
Production planning with capacitated resources and congestion
紀錄類型:
書目-電子資源 : Monograph/item
正題名/作者:
Production planning with capacitated resources and congestionby Hubert Missbauer, Reha Uzsoy.
作者:
Missbauer, Hubert.
其他作者:
Uzsoy, Reha.
出版者:
New York, NY :Springer New York :2020.
面頁冊數:
x, 285 p. :ill. (some col.), digital ;24 cm.
Contained By:
Springer eBooks
標題:
Production planning.
電子資源:
https://doi.org/10.1007/978-1-0716-0354-3
ISBN:
9781071603543$q(electronic bk.)
Production planning with capacitated resources and congestion
Missbauer, Hubert.
Production planning with capacitated resources and congestion
[electronic resource] /by Hubert Missbauer, Reha Uzsoy. - New York, NY :Springer New York :2020. - x, 285 p. :ill. (some col.), digital ;24 cm.
Chapter 1. Introduction -- Chapter 2. Workload and Cycle Time in the Production Unit -- Chapter 3. Production Planning and Control Frameworks -- Chapter 4. The Workload Control Approach -- Chapter 5. Planning Models with Stationary Fixed Lead Times -- Chapter 6. Time - Varying Lead Times and Iterative Multi - Model Approaches -- Chapter 7. Univariate Clearing Functions -- Chapter 8. Multivariate Clearing Functions -- Chapter 9. Lot Sizing Models Using Multidimensional Clearing Functions -- Chapter 10. Applications of Clearing Functions -- Chapter 11. Conclusions and Future Directions.
This book presents a comprehensive overview of recent developments in production planning. The monograph begins with an introductory chapter reviewing the need for these models of production planning that operate by determining time-phased releases of work into the facility or supply chain, relating these to the Manufacturing Planning and Control (MPC) and Advanced Planning and Scheduling (APS) frameworks that form the basis of most academic research and industrial practice. The extensive body of work on Workload Control is also placed in this context, and the need for improved models motivated by a discussion of the difficulties these approaches encounter. The next two chapters present a detailed review of the state of the art in optimization models based on exogenous planned lead times, examining the cases where these can take both integer and fractional values. The difficulties arising in estimating planned lead times that are consistent with factory behavior are highlighted, noting that many of these lead to non-convex optimization models. Attempts to address these difficulties by iterative multimodel approaches that combine simulation and mathematical programming are also discussed in detail. The next three chapters of the volume address the set of techniques developed using clearing functions, which represent the expected output of a resource in a planning period as a function of the expected workload of the resource during that period. The chapters on this subject propose a basic optimization model for multiple products, discuss the difficulties of this model and some possible solutions, review prior work, and discuss a number of alternative formulations of the clearing function concept with their respective advantages and disadvantages. Applications to lot sizing decisions and a number of other specific problems are also described. The volume concludes with an assessment of the state of the art described in the volume, and several directions for future work.
ISBN: 9781071603543$q(electronic bk.)
Standard No.: 10.1007/978-1-0716-0354-3doiSubjects--Topical Terms:
202396
Production planning.
LC Class. No.: HD38.5 / .M577 2020
Dewey Class. No.: 658.40301
Production planning with capacitated resources and congestion
LDR
:03628nmm a2200337 a 4500
001
574688
003
DE-He213
005
20200708112406.0
006
m d
007
cr nn 008maaau
008
201016s2020 nyu s 0 eng d
020
$a
9781071603543$q(electronic bk.)
020
$a
9781071603529$q(paper)
024
7
$a
10.1007/978-1-0716-0354-3
$2
doi
035
$a
978-1-0716-0354-3
040
$a
GP
$c
GP
041
0
$a
eng
050
4
$a
HD38.5
$b
.M577 2020
072
7
$a
KJT
$2
bicssc
072
7
$a
BUS049000
$2
bisacsh
072
7
$a
KJT
$2
thema
072
7
$a
KJMD
$2
thema
082
0 4
$a
658.40301
$2
23
090
$a
HD38.5
$b
.M678 2020
100
1
$a
Missbauer, Hubert.
$3
862416
245
1 0
$a
Production planning with capacitated resources and congestion
$h
[electronic resource] /
$c
by Hubert Missbauer, Reha Uzsoy.
260
$a
New York, NY :
$b
Springer New York :
$b
Imprint: Springer,
$c
2020.
300
$a
x, 285 p. :
$b
ill. (some col.), digital ;
$c
24 cm.
505
0
$a
Chapter 1. Introduction -- Chapter 2. Workload and Cycle Time in the Production Unit -- Chapter 3. Production Planning and Control Frameworks -- Chapter 4. The Workload Control Approach -- Chapter 5. Planning Models with Stationary Fixed Lead Times -- Chapter 6. Time - Varying Lead Times and Iterative Multi - Model Approaches -- Chapter 7. Univariate Clearing Functions -- Chapter 8. Multivariate Clearing Functions -- Chapter 9. Lot Sizing Models Using Multidimensional Clearing Functions -- Chapter 10. Applications of Clearing Functions -- Chapter 11. Conclusions and Future Directions.
520
$a
This book presents a comprehensive overview of recent developments in production planning. The monograph begins with an introductory chapter reviewing the need for these models of production planning that operate by determining time-phased releases of work into the facility or supply chain, relating these to the Manufacturing Planning and Control (MPC) and Advanced Planning and Scheduling (APS) frameworks that form the basis of most academic research and industrial practice. The extensive body of work on Workload Control is also placed in this context, and the need for improved models motivated by a discussion of the difficulties these approaches encounter. The next two chapters present a detailed review of the state of the art in optimization models based on exogenous planned lead times, examining the cases where these can take both integer and fractional values. The difficulties arising in estimating planned lead times that are consistent with factory behavior are highlighted, noting that many of these lead to non-convex optimization models. Attempts to address these difficulties by iterative multimodel approaches that combine simulation and mathematical programming are also discussed in detail. The next three chapters of the volume address the set of techniques developed using clearing functions, which represent the expected output of a resource in a planning period as a function of the expected workload of the resource during that period. The chapters on this subject propose a basic optimization model for multiple products, discuss the difficulties of this model and some possible solutions, review prior work, and discuss a number of alternative formulations of the clearing function concept with their respective advantages and disadvantages. Applications to lot sizing decisions and a number of other specific problems are also described. The volume concludes with an assessment of the state of the art described in the volume, and several directions for future work.
650
0
$a
Production planning.
$3
202396
650
0
$a
Business logistics.
$3
199351
650
1 4
$a
Operations Research/Decision Theory.
$3
273963
650
2 4
$a
Production.
$3
753152
650
2 4
$a
Operations Research, Management Science.
$3
511451
700
1
$a
Uzsoy, Reha.
$3
510543
710
2
$a
SpringerLink (Online service)
$3
273601
773
0
$t
Springer eBooks
856
4 0
$u
https://doi.org/10.1007/978-1-0716-0354-3
950
$a
Business and Management (Springer-41169)
筆 0 讀者評論
全部
電子館藏
館藏
1 筆 • 頁數 1 •
1
條碼號
館藏地
館藏流通類別
資料類型
索書號
使用類型
借閱狀態
預約狀態
備註欄
附件
000000180796
電子館藏
1圖書
電子書
EB HD38.5 .M678 2020 2020
一般使用(Normal)
在架
0
1 筆 • 頁數 1 •
1
多媒體
多媒體檔案
https://doi.org/10.1007/978-1-0716-0354-3
評論
新增評論
分享你的心得
Export
取書館別
處理中
...
變更密碼
登入