捷運工程 - 施工管理
Overview
Works: | 6 works in 6 publications in 6 languages |
---|
Titles
冷凍工法(一) = Freezing Method(1):Planning, Design and Construction of Freezing Method Applied on a Xinzhuang Line Cross River Section : 新莊線過河段冷凍工法規劃設計與施工. 1
by:
(Language materials, printed)
新莊線潛盾隧道穿越臺鐵高鐵結構工程 = Xinzhuang Line's Shield Tunnels Psaaing Beneath Existing Construction of Taiwan Railways and Taiwan High Speed Rail
by:
(Language materials, printed)
冷凍工法(二) = Freezing Method(2):Construction and Management Practice of Freezing Method Applied on a Xinzhuang Line Shield Tunnel Work Shaft : 新莊線潛盾工作井冷凍工法施工與管理實務. 2
by:
(Language materials, printed)
冷凍工法(三) = Freezing Method(3):Construction Practice of Freezing and Grouting Method Applied on a Xinzhuang Line Turnout Section : 新莊線道岔段冷凍與灌漿工法施工實務. 3
by:
(Language materials, printed)
冷凍工法(四) = Freezing Method(4):Case Study Freezing Method Applied on a Tunnel Joint Accident Recovery : 隧道接頭意外事故復原案例. 4
by:
(Language materials, printed)
Subjects