公共工程契約解除與終止之研究 = A Study on Terminat...
國立高雄大學法律學系碩士班

 

  • 公共工程契約解除與終止之研究 = A Study on Termination of Public Construction Contract
  • 紀錄類型: 書目-語言資料,印刷品 : 單行本
    並列題名: A Study on Termination of Public Construction Contract
    作者: 朱雅蘭,
    其他團體作者: 國立高雄大學
    出版地: [高雄市]
    出版者: 撰者;
    出版年: 2012[民101]
    面頁冊數: 233面表格 : 30公分;
    標題: 公共工程契約,解除終止,押標金,履約保證金,保固金,損害賠償
    標題: Public Construction Contract.Termination
    電子資源: http://handle.ncl.edu.tw/11296/ndltd/88185386024972055185
    附註: 參考書目:面218-222
    摘要註: 摘要本論文的源起是對於契約解除與終止的研究,契約的解除與終止,除了合意解除與終止外,另有法定解除及終止事由,在契約解除或終止後,兩者效力並不相同,適用對象也不同,且依民法260條規定,解除權之行使,不妨害損害賠償之請求,因此契約解除終止後之法律效果及損害賠償之請求,將成為本文重心。在公共工程中,工程採購契約之解除與終止,除合意終止之外,也有法定或契約終止事由,而工程採購契約中,往往也並列解除與終止事由,因此,若契約當事人欲從公共工程契約中脫離,其所應該主張者,應該為終止或解除,發生疑義,而終止或解除後之效果,又有何不同,亦為本文討論標的。另外違約金及定金之區辨,在公共工程契約中,因為有押標金、履約保證金等之履約擔保,此等履約擔保,在發生履約爭議後,如果解除契約應該如何返還,也是本文討論重點。最後並針對1999年FIDIC新紅皮書及AIA_201契約條款中,關於契約解除與終止之相關規定,做成分析及比較。 AbstractFrom the source of this thesis for rescission and termination contract to lift and termination, in addition to the desirable to lift and terminate, while the statutory discharge and the causes for termination, rescission or termination, the two effects are not the same applicable the object is also different, and the provisions of the 260 of the Civil Code, the right to terminate the exercise, without prejudice to the request of the damages, rescission after the termination of the legal effect and damages request, will become of this article the focus.In public works, the lifting of the engineering procurement contract and termination In addition to the desired termination of a statutory or contractual termination of the subject, and the procurement of construction contracts, often tied to the lifting and the causes for termination, therefore, if the contracting parties want from the public works contract they should be advocates, should be terminated or discharged, doubt arises as to terminate or cancel the effect after detachment, what is different, also This article discusses the subject.Another distinction of liquidated damages and deposit in a public works contract, the bid bond, performance bond, performance bond, such performance guarantee, contract performance disputes, if the lifting of the contract should be on how to return this article the focus of discussion .Finally, for the 1999 FIDIC new Redbook and AIA_201 of contract provisions on rescission and termination of the relevant provisions of the made analysis and comparison.
館藏
  • 2 筆 • 頁數 1 •
 
310002291634 博碩士論文區(二樓) 不外借資料 學位論文 TH 008M/0019 380101 2574 2012 一般使用(Normal) 在架 0
310002291642 博碩士論文區(二樓) 不外借資料 學位論文 TH 008M/0019 380101 2574 2012 c.2 一般使用(Normal) 在架 0
  • 2 筆 • 頁數 1 •
評論
Export
取書館別
 
 
變更密碼
登入