公共工程契約工作範圍相關爭議問題之研究 = The study on t...
國立高雄大學法律學系碩士班

 

  • 公共工程契約工作範圍相關爭議問題之研究 = The study on the scope of work in Public Construction Contracts
  • 紀錄類型: 書目-語言資料,印刷品 : 單行本
    並列題名: The study on the scope of work in Public Construction Contracts
    作者: 王政一,
    其他團體作者: 國立高雄大學
    出版地: [高雄市]
    出版者: 撰者;
    出版年: 2014[民103]
    面頁冊數: 234面圖,表 : 30公分;
    標題: 工程契約
    標題: construction contract
    電子資源: http://handle.ncl.edu.tw/11296/ndltd/69124665544548879423
    附註: 參考書目:面220-225
    附註: 103年12月16日公開
    摘要註: 工程契約之工作範圍對於契約雙方當事人而言,是重要的一環。承攬人應依工作範圍施作,不得請求額外費用。然而工程契約對於工作範圍之規範未必清楚明確,造成當事人對於工作範圍有所爭執。在工作範圍爭議上,定作人傾向將工作範圍擴大解釋以避免承攬人請求調整工程契約價金,承攬人則傾向將工作範圍縮小解釋,以利其向定作人請求調整工程契約價金。此外,公共工程因具備持續期間漫長、受天候及工區條件之影響甚大、參與之專業人士眾多、設計與成本難以精確估計等特質,當事人常難以於計畫之初完整預料契約執行過程中可能遇到之障礙,是以公共工程契約當事人於契約執行中就契約內容進行調整實為常態,而契約內容之調整往往變動了契約當事人之對價關係,而產生了究竟得否調整契約價金之爭議。 公共工程契約常需要進行契約解釋與契約變更,此亦為公共工程契約與一般契約相異之特色。本文將以公共工程契約之工作範圍為主軸,探討涉及工作範圍之工程契約解釋、工程變更之性質與限制、實作數量差異、漏項、異常工地狀況等爭議問題。以目前常見法院實務就公共工程履約爭議案件判決之歧異見解予以研析,參考學者及實務界所提出之論著及見解,並藉由整合工程及法律之專業領域綜整及研析,進而嘗試提出本研究之見解及建議,期望可供工程或司法實務作為處理類似爭議事件之參考。 One very important part of any contract, whether between and owner and general contractor, is the so called “scope of work”. The owner will claim the contract's scope of work includes all work performed or promised to be performed by the contractor for the agreed contract price. However, the scope of work isn’t obvious.The parties to the contract may interpret the contractor's responsibilities differently, leading to disputes related to the work to he performed and the compensation to be paid. The owner wants as much work as possible for the payment, whereas the contractor wants to do as little as possible. Therefore, the owner tries to define the scope as broadly as possible; in contrast, the contractor seeks to define specific tasks, with everything else being an "extra". Besides , public construction projects are characterized by long duration, being influenced greatly by weather and site conditions, involving numerous professionals and difficult to estimate the total cost. Hence participators of a public construction project are often unable to foresee the obstacles confronted during the whole process. Therefore, alternating a public construction contract is not unusual and will create an issue whether the contract price should be adjusted accordingly. Public construction contracts are unusual amongst commercial contracts in that they generally have interpretations and variation/ changes clauses. This paper will mainly focus on the scope of work. The discussion of issues includes exposition, variation/change, quantity difference, omitted items, and differing site condition. As for the research method, except the analysis bases on the domestic legal cases, the thesis also attempts to discuss about scholar’s opinions about such issues. The discussion also attempts to combine the engineering field and the legal field, and at last, intends to submit some opinions or recommendations in order to provide a reference for the court or construction practice in dealing with the disputes of public construction contracts.
館藏
  • 2 筆 • 頁數 1 •
 
310002469651 博碩士論文區(二樓) 不外借資料 學位論文 TH 008M/0019 380101 1011 2014 一般使用(Normal) 在架 0
310002469669 博碩士論文區(二樓) 不外借資料 學位論文 TH 008M/0019 380101 1011 2014 c.2 一般使用(Normal) 在架 0
  • 2 筆 • 頁數 1 •
評論
Export
取書館別
 
 
變更密碼
登入